Latest
YesterdaySaanich Starts Five-Year Upgrade Of Water Meter Reading Equipment At 30,000 Properties YesterdayDubai’s Moro Hub Partners With ThingsBoard To Host Government IoT Applications On Moro Cloud YesterdayMonza Completes 12,688-Point LED Streetlight Replacement And Adds QR Fault Reporting YesterdayUSDOT Selects UCLA, University Of Michigan And Derq For $5.5M Intersection Safety Phase One YesterdaySIEL-Territoire d’Énergie Loire Reaches 25,000 Sensors On Its ROC42 LoRaWAN Network 25 OctMBTA Begins Hayden AI Bus Lane And Bus Stop Camera Enforcement On Routes SL4 And SL5 24 OctLos Angeles Council Approves 50 DASH Bus Enforcement Cameras In $3.43M Hayden AI Contract 22 OctFriuli Venezia Giulia Council Backs Adaptive Streetlight Study After €156.6M Udine Crash Toll 22 OctNYC Department of Transportation Ends Automotus Curb Camera Pilot on the Upper West Side 22 OctAomori Prefecture Installs 12 AI Bear-Detection Cameras In Hakkoda Mountains After Fatal Attack
Kurrantly News · Weekly briefingThe week in smart cities and utilities, in one email
Share
Waste · Australia

Veolia to Build Advanced Recycling Facility in ACT Under €67 Million Contract

Kurrant News Desk · ·1 min read

Veolia has secured a €67 Million (AUD $109 million) contract to construct, operate, and maintain a new materials recovery facility (MRF) in Hume, ACT. The facility is expected to process up to 115,000 tonnes of mixed recyclables annually, reducing greenhouse gas emissions by 3.365 metric tonnes over 20 years.

As part of Veolia’s global GreenUp strategy, the facility will separate paper, cardboard, glass, plastics, steel, and aluminium using advanced sorting technology, including optical recognition, air jets, and magnetic extraction. A dedicated glass processing unit will also crush and purify used glass for reuse.

The project will create 112 jobs during construction and 24 permanent operational roles. An additional €17.3 Million (AUD$28 million) will fund recycling education programs and a community education centre.

Supported by the Australian and ACT governments through the Recycling Modernisation Fund, the facility will also serve neighbouring NSW regions. Construction is set to begin in 2026 after the demolition of the existing site, with completion expected within 38 months.

The MRF includes enhanced fire safety systems to address risks from hazardous materials in recycling streams. The initiative aligns with national efforts to expand recycling capacity, backed by a $1 billion industry and government co-investment.