Latest
YesterdayFriuli Venezia Giulia Council Backs Adaptive Streetlight Study After €156.6M Udine Crash Toll YesterdayNYC Department of Transportation Ends Automotus Curb Camera Pilot on the Upper West Side YesterdayAomori Prefecture Installs 12 AI Bear-Detection Cameras In Hakkoda Mountains After Fatal Attack YesterdayAjuntament d’Olot Puts Sewer Cameras and GIS Mapping on 161 Km Network YesterdayCity of São Paulo’s Smart Sampa Contract Allows €10.4M Fine After Data Exposure YesterdayHonolulu Emergency Management Plans $300K Flood Detection Pilot By June 2027 YesterdayPuigcerdà Council Funds €373,000 Water Network Upgrade YesterdayRegione Basilicata Opens €18.8M Public Lighting Call For Comuni And Two Provinces YesterdayARENA Commits A$4M To JET Charge For Up To 130 V2G Fleet Vehicles In The ACT YesterdayInnovate UK And Private Investors Commit £750K To Go Eve’s DockChain Multi-Bay EV Charging
Kurrantly News · Weekly briefingThe week in smart cities and utilities, in one email
Share
Street Lighting · Spain

Spain Allocates €133 Million in Zero-Interest Loans to Upgrade Public Lighting in 68 Municipalities

Kurrant News Desk · ·1 min read

Spain’s Ministry for the Ecological Transition and the Demographic Challenge has provisionally awarded €133 million in loans under the National Energy Efficiency Fund (FNEE) to support public lighting upgrades across 68 municipalities. The program, managed by the Institute for Energy Diversification and Saving (IDAE), aims to reduce light pollution and energy consumption by replacing outdated systems with high-efficiency luminaires and smart control equipment.

Andalusia leads in the number of funded projects (17), receiving €41 million, followed by Catalonia with €18 million for 11 projects. Major recipients by funding volume include Zaragoza (€9.9M), Sevilla (€9.4M), Alcalá de Guadaíra (€7.4M), Avilés (€8.5M), and Granada (€8M). The selected projects are expected to reduce energy use by over 70% and achieve payback in approximately seven years. The loans, covering up to 100% of project costs, are interest-free and repayable over a maximum of 10 years with a one-year grace period.